Project Overview:
Bechtel and Westinghouse Electric Company have partnered to deliver the first nuclear power reactors in Poland for our customer, the Polish Entity Polskie Elektrownie Jadrowe (PEJ). Bechtel will be the Engineering, Procurement, and Construction (EPC) contractor for the project. As the EPC, our responsibilities will include providing the design for the Turbine Island and Balance of Plant as well as the construction of the entire facility.
This is a one-of-a-kind opportunity, and we are looking for the talent that will help expand Poland’s nuclear base and build a strong and long-lasting energy future for generations to come.
Position Summary:
In this position, the engineer will support design development of Fire Protection Systems and equipment for project(s) by evaluating, selecting, and applying applicable fire safety, techniques, procedures and criteria to originate reports, drawings, calculations, and more with applicable procedures, codes, standards, and contract requirements. The engineer will work with mechanical engineers, other disciplines/functions, and/or the client.
Upon initial hire and onboarding, the position will require full-time presence in the Warsaw office. Part-time telework flexibility may be an option as the project progresses.
Responsibilities:
Qualifications and Skills
Basic Qualifications:
Minimum Qualifications:
Preferred Qualifications: